On Tuesday, Mar. 1 I had the chance to go back inside the Kauffman Center on a tour again. At present most of the seats have been installed in Helzberg Hall, pictured in both photos below. The seat installation in the adjacent Muriel Kauffman Theatre is to begin very shortly as well.

Above: Standing where part of the pipe organ will be installed.

View from the upper level at Helzberg Hall.

Backstage at Muriel Kauffman Theatre at the Kauffman Center

I don’t yet fully understand all the technologies at play inside the Kauffman Center. I’ve had them shown to me on a couple of occasions and I wish I could recite what and why this large edifice is hanging down from the ceiling behind the stage of the Muriel Kauffman Theatre but the proper response escapes me at present.

Muriel Kauffman Theatre Under Construction

A fisheye view behind the stage of the Muriel Kauffman Theatre at the Kauffman Center. As you can see there is a level underneath the stage that is made visible from this angle.

From my visit to the Kauffman Center’s construction site last Friday, here are a couple external up-close shots. From this angle the Grand Lobby is the prominent feature being seen of the new building.

Facing eastward, Canon EF 16-35 L II f/2.8 Lens at f/18, 16mm, ISO 50, Shutter speeds varied.

Facing westward in the afternoon, Canon EF 15 mm f/2.8 Fisheye Lens at f/18, 15mm ISO 50, Shutter speeds varied

Last Friday I had the chance again to go on-site and inside the Kauffman Center for the Performing Arts for further construction and progress photography. For this post I’m showing the two venues in the building, the Muriel Kauffman Theatre and Helzberg Hall.

Muriel Kauffman Theatre Under Construction in January 2011.

In the instance of both photos I stood as far to the top and center of the interiors as I could and used my fisheye lens (Canon EF 15 mm f/2.8 Fisheye) with my 5D Mark II DSLR. I used HDR/Tone mapping in the computer post-processing to even out the differing levels of exposure that were inherent in both scenes.

Helzberg Hall Under Construction in January 2011.

The Kauffman Center is scheduled to open this coming September.

Kauffman Center for the Performing Arts Construction on the evening of Dec. 1, 2010.

I’ve had a paying client or two here and there request up-to-date images of the Kauffman Center’s current progress, which is why I have so many shots of the grand structure rising as of late, this being yet another. I don’t know about you but I’m in the mood for another good old fashioned protest and march to go photo-journal accompanied with news vans or protestors getting willfully arrested . Eh, eh? Sound good?